Image of ISO 500 and 100th Anniversary of Turkey

CW Enerji has completed the installation of a land type solar power plant with a power of 1934 kWp in Kurşunlu district of Çankırı.

With the installation of 1934 kWp SPP, the electricity of an average of 1700 households per year can be met with renewable energy, and an average of 2326 tons of CO2, 7 tons of SO2 and 2.6 tons of NOx gas emissions per year can be reduced. It is planned to produce an average of 8.224 kWp per day and an average of 2.998.320 kWp per year in the SPP with a power of 1934 kWp. The solar power plant that the investor has built on its land is expected to pay for itself in an average of 6 years. In addition, it will be able to generate $13.3/cent for each surplus KW from the electricity generated at the solar power plant.

🍪 CW Enerji Cookie Policy

You can review our Cookie Policy to get information about the third party cookies we use as CW Enerji. Click \'Accept\' to approve our Cookie Policy.

MORE INFO