Image of ISO 500 and 100th Anniversary of Turkey

CW Enerji has completed the installation of a 250 KWp rooftop solar power plant in Antalya's Elmalı district.

With a 250 KWp SPP installation, an average of 290.75 tons of CO2, 0.875 tons of SO2 and 0.325 tons of NOx gas emissions per year can be reduced.

With the installation of 250 KWp SPP, the electricity of 219 households per year can be met with renewable energy. The solar power plant that the investor has built on its roof is expected to pay for itself in an average of 6 years. In addition, it will be able to generate $13.3/cent for each surplus KW from the electricity generated at the solar power plant.

🍪 CW Enerji Cookie Policy

You can review our Cookie Policy to get information about the third party cookies we use as CW Enerji. Click \'Accept\' to approve our Cookie Policy.

MORE INFO