Image of ISO 500 and 100th Anniversary of Turkey

CW Enerji completed the installation and pre-acceptance of a land type solar power plant with a power of 1247 kWp in Ulubey district of Uşak.

With a 1247 kWp SPP installation, an average of 1,453.75 tons of CO2, 1.56 tons of SO2 and 1.56 tons of NOx gas emissions per year can be reduced.

With the installation of 1247 kWp SPP, the electricity of an average of 1050 households per year can be met with renewable energy. The solar power plant that the investor has built on its land is expected to pay for itself in an average of 6 years. In addition, it will be able to generate $13.3/cent for each surplus KW from the electricity generated at the solar power plant.

🍪 CW Enerji Cookie Policy

You can review our Cookie Policy to get information about the third party cookies we use as CW Enerji. Click \'Accept\' to approve our Cookie Policy.

MORE INFO