The 1267,2 kWp SPP project implementation, which we set up in Antalya Organized Industrial Zone, has been completed.
Antalya’da 5 yıldızlı bir otelde uygulamasını yaptığımız 843,52 kWp GES projemiz tamamlandı. Yılda 1.350.000 kW elektrik üretmesi beklenen GES, aynı süreçte 681.000 kg karbondioksit emilimi
3.1 MW SPP project implementation, which we set up in Adana / Kozan district, has been completed.
Installation of 3MW GES applied in Denizli has been completed. 11,880 CWT320Wp PM model solar panels were used in project.
The installation implementation of our 342.24 kWp SPP project that we built on a factory roof in Bursa-Osmangazi has been completed.
3,333 MW SPP application has been completed, which we set up turnkey installation in Bursa Demirtaş OSB .
In the district of Serik, Antalya, the installation of a 1,000.2 kWp solar roof system by the company CW Enerji. 2160 pcs. CWT-270-60P and 1668
CW Enerji, 02.10.2013 tarihli 28783 sayılı Elektrik Piyasasında Lisanssız Elektrik Üretim Yönetmeliğine uygun olarak, Balıkesir ili Dursunbey ilçesi 1.897,5 kWp gücünde arazi tipi güneş enerjisi
In the district of Elmali, Antalya, was carried out by the company CW Enerji, the installation of a solar roof system with 500kWp. The solar
In the district of Mersin, Tarsus, the installation of a 150 kWe roof system as well as 300 kWe outdoor installation by the company CW